INSPECTION REPORT
Table of Contents
Weather Conditions
Weather leading up to and including inspection day
Weather data shows 6 days prior to inspection plus inspection day. Source: WeatherAPI.com
INSPECTION AGREEMENT SUMMARY: Peach State Home Inspections & Sarah E. Thompson
This document constitutes a legally binding contract and details the terms of the home inspection carried out by Peach State Home Inspections. Clients are advised to review this agreement carefully. The inspection fee is based on the time invested in conducting the inspection and preparing the report, independent of repair costs, and is due regardless of the property purchase decision. No responsibility is assumed for costs related to identified or future defects. The inspector disclaims knowledge of any items not explicitly mentioned in this report. The services of relevant professionals (electricians, plumbers, HVAC technicians, roofers, structural engineers) may be necessary to address issues noted.
DESCRIPTION OF INSPECTION FINDINGS:
- Inspected: Area or component was thoroughly examined, and no issues were found at the time of inspection.
- Not Inspected: Area or supporting component was not inspected and may require further evaluation.
- Not Present: Area or component does not exist on the property or could not be visually located.
- Moisture Evidence Present: Visible signs of moisture or water-related issues were observed; further evaluation is recommended.
INSPECTION DETAILS:
- Visual Only: This inspection is a non-invasive, visual examination of the readily accessible areas of the property to identify material defects in specified systems and components.
- Scope: A visual review of accessible areas to identify defects in specified systems and components, modifiable upon client-inspector agreement.
- Limitations: The inspection is not exhaustive, excluding hidden, concealed, or inaccessible defects. Personal belongings and furniture are not moved during the inspection.
- Equipment Testing: Involves testing responses to normal controls without disassembly, except for easily removable service panels.
- Observation-Based: Findings are specific to the inspection date and do not predict future conditions. Not all defects may be identified.
- Material Defects: Identified issues significantly affecting property value or posing unreasonable risks.
EXCLUSIONS AND LIMITATIONS:
- Limited solely to the paid inspection fee. Excludes liability for repair costs, property damage, or injury. The report is intended only for the client named above and is not a guarantee, warranty, or insurance policy.
CLIENT ACKNOWLEDGMENT:
- Non-Compliance and Hidden Defects: Areas not evaluated for safety code compliance may contain hidden defects that cannot be identified during a visual inspection.
- Special Loan Types: This inspection does not assess or comment on FHA standards, which are subject to change.
- Environmental and Specialized Inspections: This inspection does not include testing for radon, lead-based paint, asbestos, mold, or other potentially hazardous substances. Private systems and pest inspections are also excluded.
- Liability: Liability is limited solely to the amount of the paid inspection fee. The inspection report does not cover repair costs, property damage, or injury. It is intended exclusively for the client and does not serve as a guarantee, warranty, or insurance policy.
- Modern Standards: Highlights safety issues but does not inspect for code compliance. Observations on mixed materials and incomplete areas are included. Manufacturer recalls are not part of the inspection.
COMMENT: Organic debris including leaves, pine needles, and small branches was observed accumulating in the gutter troughs and along the lower edge of the roof covering. This buildup can impede proper water drainage, cause water to back up under the shingles, and accelerate deterioration of the roofing materials. Recommend having a qualified contractor clean all gutters and remove vegetation from the roof surface. Regular maintenance (at least twice per year) is advised to prevent future accumulation.
COMMENT: Minor hairline and surface-level cracking was observed in the concrete driveway. These cracks appear consistent with normal shrinkage and thermal expansion typical of poured concrete in the Southeast climate. No significant heaving, settling, or displacement was noted at this time. Recommend monitoring these areas seasonally for any widening or changes. Sealing the cracks with a flexible concrete caulk is advisable to prevent moisture intrusion and further deterioration during freeze-thaw cycles.
COMMENT: The exterior stairway railing balusters were observed to have spacing that exceeds the 4-inch maximum allowed by current safety standards (IRC R312.1.3). A child's body or head could pass through openings wider than 4 inches, creating a fall or entrapment hazard. This is a safety concern that should be corrected promptly. Recommend having a qualified contractor install additional balusters or modify the existing railing system to reduce all openings to no more than 4 inches apart. This correction is especially important if young children will be present in the home.
COMMENT: The rear right downspout was observed discharging directly onto the back deck landing area rather than being directed away from the structure. This improper drainage pattern can lead to standing water on the deck surface, accelerated wood deterioration, soil erosion around the deck footings, and potential moisture intrusion into the crawl space below. Recommend re-routing the downspout extension at least 4-6 feet away from the foundation and deck structure using a rigid or flexible downspout extension directed toward an appropriate drainage area. A splash block or underground drain pipe may also be considered for a permanent solution.
COMMENT: The main floor heating unit is located in the crawl space beneath the home. The unit is a 2-ton electric forced-air furnace manufactured in 2022. At the time of inspection, the system responded to thermostat controls and appeared to be operating within normal parameters. The ductwork in the crawl space appeared to be insulated and in serviceable condition. Recommend maintaining regular HVAC service intervals per manufacturer specifications.
COMMENT: The second floor heating unit is located in the attic space. The unit is a 3-ton electric forced-air furnace manufactured in 2022. The system responded to thermostat controls and appeared to be operating within normal parameters at the time of inspection. The condensate drain line was observed to be routed to an appropriate termination point. Recommend verifying the emergency overflow pan and secondary drain line are functioning properly to prevent potential water damage to living areas below.
COMMENT: The exterior condensing unit for the main floor cooling system is located on the left side of the home. The unit appeared to be level on its pad and in serviceable condition. Refrigerant lines and electrical connections appeared intact. The area around the unit should be kept clear of vegetation and debris (at least 2 feet of clearance on all sides) to ensure adequate airflow and efficient operation.
COMMENT: The air filter for the crawl space HVAC unit is a disposable type, sized 20x20x1 or 20x20x5 (depending on filter housing depth). At the time of inspection, the filter appeared to be moderately used. Recommend replacing the filter every 1-3 months (for 1-inch filters) or every 6-12 months (for 5-inch media filters) to maintain optimal airflow and indoor air quality. A clean filter also helps extend the life of the HVAC system and improve energy efficiency.
COMMENT: The air filter for the attic HVAC unit is a disposable type, sized 20x20x1 or 20x20x5 (depending on filter housing depth). The filter appeared to be in serviceable condition at the time of inspection. Recommend establishing a regular filter replacement schedule. Attic-mounted units can be more susceptible to condensation issues when airflow is restricted by dirty filters, which could result in moisture damage to ceilings below. Mark the filter size on the unit housing for future reference.
COMMENT: The main water supply shut-off valve is located in the crawl space. The valve appeared to be a gate-style valve in serviceable condition. It is important that all occupants know the location of this valve in case of a plumbing emergency. Recommend exercising the valve periodically (turning it on and off) to prevent it from seizing due to mineral buildup or corrosion. If the valve has not been operated in some time, have a licensed plumber verify it functions properly before relying on it for an emergency shut-off.
COMMENT: A secondary water shut-off valve was observed at the yard meter located near the street. This valve is typically controlled by the local water utility and serves as the primary shut-off point for the entire property. In the event of a major leak or plumbing failure, this valve can be used to stop all water flow to the home. Recommend keeping the meter box lid accessible and free of soil or vegetation overgrowth for emergency access.
COMMENT: The bathroom vanity sink top was observed to be inadequately secured to the wall surface. Movement or shifting of the countertop could displace the water supply lines and drain connections beneath, potentially resulting in a water leak. This is especially concerning in bathrooms where the vanity may be leaned on or bumped during daily use. Recommend having a qualified contractor properly anchor the sink top to the wall framing using appropriate fasteners and adhesive to prevent any displacement of the plumbing connections.
COMMENT: The master bathroom bathtub was observed to be insufficiently secured to the floor covering. When weight is applied or the tub is in use, movement could stress or disconnect the drain assembly and water supply connections underneath, leading to hidden water leaks that may cause subfloor damage or mold growth over time. Recommend having a qualified contractor properly anchor the tub to the subfloor and verify all plumbing connections are secure. A bead of flexible caulk should also be applied at the tub-to-floor junction to prevent water infiltration.
COMMENT: The main electrical disconnect and meter base are located on the right (east) side of the home. The 200-amp service entrance appeared to be in serviceable condition with underground service conductors. The meter base, weatherhead, and service connections appeared properly sealed and intact. All occupants should be familiar with this location in case the main power needs to be shut off during an electrical emergency. The area around the meter should be kept clear and accessible at all times.
COMMENT: The main electrical panel is located in the garage. The panel appeared to be properly labeled with circuit identification, and all breakers were observed to be in their designated positions. No signs of overheating, arcing, or corrosion were noted on accessible components. The panel cover was intact and all knockouts were properly filled. The panel appeared to have adequate capacity for the home's current electrical needs.
COMMENT: The ceiling fan in the upstairs left bedroom did not respond to the wall switch or pull chain during the inspection. The fan blade assembly and motor housing appeared to be intact and properly mounted. The issue may be related to a faulty wall switch, loose wiring connection at the junction box, or a defective fan motor. Recommend having a licensed electrician evaluate and repair the fan to restore full functionality. Until repaired, the circuit serving this fixture should be monitored for any unusual behavior.
COMMENT: The refrigerator receptacle is currently supplied by one of the 20-amp branch circuits that also serves the kitchen countertop receptacles. It is recommended to monitor the circuit for nuisance tripping. If the refrigerator defrost cycle occurs simultaneously with the use of other high-draw countertop appliances (like a toaster or coffee maker), the circuit breaker may trip, potentially leading to food spoilage.
COMMENT: Sections of insulation in the crawl space were observed to be displaced, sagging, or missing from the floor joist bays. Improperly secured insulation reduces the home's energy efficiency, can contribute to uneven floor temperatures, and may allow moisture to accumulate against the subfloor. Recommend having a qualified insulation contractor re-secure all displaced batts using mechanical fasteners (insulation supports or wire hangers) and replace any missing sections to restore the full thermal envelope. A vapor barrier inspection should also be performed to ensure the crawl space moisture management system is intact.
GENERAL SUMMARY
James R. Mitchell
The following items or discoveries indicate that these systems or components do not function as intended or adversely affects the habitability of the dwelling; or warrants further investigation by a specialist, or requires subsequent observation. This summary shall not contain recommendations for routine upkeep of a system or component to keep it in proper functioning condition or recommendations to upgrade or enhance the function or efficiency of the home. This Summary is not the entire report. The complete report may include additional information of concern to the customer. It is recommended that the customer read the complete report.
1. Roof
Gutters
Inspected
COMMENT: Organic debris including leaves, pine needles, and small branches was observed accumulating in the gutter troughs and along the lower edge of the roof covering. This buildup can impede proper water drainage, cause water to back up under the shingles, and accelerate deterioration of the roofing materials. Recommend having a qualified contractor clean all gutters and remove vegetation from the roof surface. Regular maintenance (at least twice per year) is advised to prevent future accumulation.
2. Exterior
Walkways & Driveways
Inspected
COMMENT: Minor hairline and surface-level cracking was observed in the concrete driveway. These cracks appear consistent with normal shrinkage and thermal expansion typical of poured concrete in the Southeast climate. No significant heaving, settling, or displacement was noted at this time. Recommend monitoring these areas seasonally for any widening or changes. Sealing the cracks with a flexible concrete caulk is advisable to prevent moisture intrusion and further deterioration during freeze-thaw cycles.
Stairs, Steps, Stoops, Stairways & Ramps
Inspected
COMMENT: The exterior stairway railing balusters were observed to have spacing that exceeds the 4-inch maximum allowed by current safety standards (IRC R312.1.3). A child's body or head could pass through openings wider than 4 inches, creating a fall or entrapment hazard. This is a safety concern that should be corrected promptly. Recommend having a qualified contractor install additional balusters or modify the existing railing system to reduce all openings to no more than 4 inches apart. This correction is especially important if young children will be present in the home.
5. Plumbing
Sinks, Tubs & Showers (Functional Drainage)
Inspected
COMMENT: The bathroom vanity sink top was observed to be inadequately secured to the wall surface. Movement or shifting of the countertop could displace the water supply lines and drain connections beneath, potentially resulting in a water leak. This is especially concerning in bathrooms where the vanity may be leaned on or bumped during daily use. Recommend having a qualified contractor properly anchor the sink top to the wall framing using appropriate fasteners and adhesive to prevent any displacement of the plumbing connections.
COMMENT: The master bathroom bathtub was observed to be insufficiently secured to the floor covering. When weight is applied or the tub is in use, movement could stress or disconnect the drain assembly and water supply connections underneath, leading to hidden water leaks that may cause subfloor damage or mold growth over time. Recommend having a qualified contractor properly anchor the tub to the subfloor and verify all plumbing connections are secure. A bead of flexible caulk should also be applied at the tub-to-floor junction to prevent water infiltration.
6. Electrical
Switches and Fixtures
Inspected
COMMENT: The ceiling fan in the upstairs left bedroom did not respond to the wall switch or pull chain during the inspection. The fan blade assembly and motor housing appeared to be intact and properly mounted. The issue may be related to a faulty wall switch, loose wiring connection at the junction box, or a defective fan motor. Recommend having a licensed electrician evaluate and repair the fan to restore full functionality. Until repaired, the circuit serving this fixture should be monitored for any unusual behavior.
Receptacles (AFCI/GFCI tested)
Inspected
COMMENT: The refrigerator receptacle is currently supplied by one of the 20-amp branch circuits that also serves the kitchen countertop receptacles. It is recommended to monitor the circuit for nuisance tripping. If the refrigerator defrost cycle occurs simultaneously with the use of other high-draw countertop appliances (like a toaster or coffee maker), the circuit breaker may trip, potentially leading to food spoilage.
11. Crawl space, insulation and ventilation
Insulation displaced/missing
Inspected
COMMENT: Sections of insulation in the crawl space were observed to be displaced, sagging, or missing from the floor joist bays. Improperly secured insulation reduces the home's energy efficiency, can contribute to uneven floor temperatures, and may allow moisture to accumulate against the subfloor. Recommend having a qualified insulation contractor re-secure all displaced batts using mechanical fasteners (insulation supports or wire hangers) and replace any missing sections to restore the full thermal envelope. A vapor barrier inspection should also be performed to ensure the crawl space moisture management system is intact.